1. Catalogs
  2. Bondtech Corporation
  3. Composite Lab Series

Composite Lab Series
1 /1Page

Composite Lab Series

Composite Lab Series
1 /1Page

Catalog excerpts

Composite Lab Series-1

• External Insulation • Vacuum Pump and Manifold Included • Air Compressor, 5hp, 175 psig, 80 gal tank • 3-Day On-Site Start-Up and Training • 24 hour Technical Support • External Insulation • 5 - Vacuum Lines (source/sensing) • Vacuum Pump and Manifold Included • Optional Chamber Cart • 3-Day On-Site Start-Up and Training • INTERNAL Insulation • Vacuum Pump and Manifold Included • Optional Cooling Tower • 3-Day On-Site Start-Up and Training • 24 Hour Technical Support Approx. Lead Time: 20 - 24 Weeks Approx. Lead Time: 20 - 24 weeks Approx. Lead Time: 24 - 28 Weeks

 Open the catalog to page 1
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.