STATUTORY GUIDANCE PGN 5/2 (25) FOR CREMATORIA NEW LEGAL REQUIREMENTS ARE COMING SOON 4 4 ► ' ► ► ◄►►►◄◄◄ ►lUr ► ◄ ► ► ► 4 PGN 5/2 (25) is the latest statutory guidance for crematoria, providing environmental and oPerational standards for local authorities to use when permitting cremations Key changes Introduced In versi°n 5/2 (25) Include new deadlines for existing cremators to ► ◄ install flue gas treatment and mercury abatement, stricter Emission Limit Values (ELVs) for ◄ ► Nitrogen oxides (NO|) and ammonia, and mandatory accreditation for monitoring methods. EMISSION LIMIT VALUE Environmental Cremation Technologies (ECT) is a true leader in the design, manufacture, and supply of advanced combustion systems and has been supplying abated cremators globally for over 15 years. ECT offer tailored solutions with adaptable configurations designed to comply with UK legislation, including the imminent PGN 5/2 (25) as well as other global legislation. We specialise in creating systems for both listed and space-constrained buildings, making us the ideal partner for complex retrofit projects.
Open the catalog to page 1NEW LEGAL REQUIREMENTS ARE COMING SOON existing cremators, i.e. plants already in operation Flue-gas treatment (including mercury abatement) must be installed within 4 yrs of publication. Otherwise, the operation will be limited to 100 hours per calendar year. NOxmonitoring and meeting an Emission Limit Value (ELV) of 200 mg/m3 must be in place within 4 yrs. ■I NH3 (ammonia) slip monitoring applies where NOx abatement is installed, with compliance from 1 month after publication. Monitoring methods, equipment, and personnel accreditation via MCERTS must be in place 1 month after publication. Fuel...
Open the catalog to page 216 Pages
8 Pages