Provider Plus® 6540-AC Installation Manual
6Pages

{{requestButtons}}

Catalog excerpts

Provider Plus® 6540-AC Installation Manual - 1

INSTALLATION MANUAL ≈QUICK SHIP PROVIDER PLUS® SURFACE-MOUNTED HEADWALL Model #6540-AC

Open the catalog to page 1
Provider Plus® 6540-AC Installation Manual - 2

OVERVIEW The Quick Ship Provider Plus® 6540-AC is a UL-listed, surface-mounted, horizontal modular headwall assembly that has been specifically designed to rapidly add capacity to an acute care space for surge type scenarios. Horizontal channels are an integral, non-removable part of the horizontal tier assembly and are flush with the front face of the unit. The lower channel surface is flat and smooth to facilitate ease of cleaning. The horizontal equipment channels have a clear anodized aluminum finish. Horizontal channel accessories are available in a sufficient variety to meet the needs...

Open the catalog to page 2
Provider Plus® 6540-AC Installation Manual - 3

To attach hanging brackets, measure 9.8" below the device console centerline to locate bottom of hanger brackets. Mark a level horizontal line at this location for use in aligning the brackets. Mount two hanger brackets (Figure 2, item 1) with 3/8" Rawl hollow wall anchors (item 2) or equivalent (by others) into wall studs only. Position hanger brackets so that both are within the length of the unit and will engage one stud each. Drill 25/64" holes through drywall and metal studs. Fasten with anchors after leveling hangers and tighten fully. Figure 2. Device Console Centerline Hanger...

Open the catalog to page 3
Provider Plus® 6540-AC Installation Manual - 4

Once unit is aligned with all services, locate position of all wall studs behind the unit. Using a 25/64" drill bit, drill one hole per stud through detent in top extrusion (Figure 4). Each anchor must pass through unit, drywall and wall stud. Fasten with 3/8" Rawl hollow wall anchors or equivalent (by others). Level unit and fully tighten all anchors. Detent in top extrusion for upper mounting anchors ELECTRICAL SERVICE CONNECTIONS Electrical connections can be made on either end of the unit. Field conditions will determine which end is more convenient. Power is to be connected to the unit...

Open the catalog to page 4
Provider Plus® 6540-AC Installation Manual - 5

Clean with mild detergent and warm water. Do not use lubricants or oils on unit. Avoid excessive moisture build-up, as it can damage mechanisms in the unit. Disinfect as required with disinfectant approved by the Environmental Protection Agency. To remove difficult spots or stains, use standard household cleansers and a soft-bristled brush. For parts or repairs, contact your sales representative. INSTALLATION TERMS AND CONDITIONS Each Modular Services unit, or unit section, shall be completely pre-wired for normal and emergency. Modular Services Company shall have no responsibility or...

Open the catalog to page 5
Provider Plus® 6540-AC Installation Manual - 6

WARRANTY Modular Services Company warrants that all equipment assemblies shall be free from defects in material and workmanship for a period of 12 months from date of the owner’s acceptance to the installing contractor or the date the equipment is put into service, whichever comes first. Warranty excludes electric lamps and/or any material not furnished by Modular Services. Warranty does not cover damage due to improper installation and/or abuse. It is the responsibility of the customer to report any noted product deficiencies to Modular Services immediately upon discovery. It is the...

Open the catalog to page 6

All Modular Services Company catalogs and technical brochures

  1. WellJoint®

    2 Pages

  2. APTUS HD & L

    2 Pages

  3. APTUS Cart

    2 Pages

  4. Method

    8 Pages

  5. NICU

    2 Pages

  6. Columns

    4 Pages

  7. Clarity

    2 Pages

  8. Profile

    8 Pages

  9. Form

    8 Pages

  10. Flatwalls

    2 Pages

  11. Console

    2 Pages

  12. Bed Docker

    2 Pages

  13. AIM LED

    4 Pages

  14. APTUS

    2 Pages

  15. ArtWorks

    4 Pages

  16. H Core

    2 Pages