
CASE STUDY / ICU MOBILITY SUPPORT MEDDO CL100-3 Ceiling Lift System Installed in the ICU of Shanghai Renji Hospital COMPLETED IN USE ROOM TYPES 2024 Daily hospital use Single-patient + four-bed rooms MEDDO / CL100-3 / RENJI HOSPITAL ICU
Open the catalog to page 1A connected mobility environment for the ICU In 2024, MEDDO completed the installation of the CL100-3 ceiling track system in the Intensive Care Unit of Shanghai Renji Hospital, affiliated with Shanghai Jiao Tong University School of Medicine. The system remains in daily use, supporting routine nursing transfers and progressive mobility activities within the ICU environment. INSTALLATION LOGIC The track layout follows the care environment and keeps the floor available for beds, monitors, and clinical teams. The design is adapted to the room geometry and the movement path required by the care...
Open the catalog to page 2ROOM-SPECIFIC DESIGN XY Track coverage across different room types Single-patient rooms and four-bed rooms are both covered by XY Track layouts, providing whole-room access for patient handling and mobility support. Different curved-track sections and bend angles can be incorporated according to the room geometry, equipment clearances, and intended care route. SINGLE-PATIENT ROOM FOUR-BED ROOM XY Track coverage reaches the main care zones around the bed and supports room-level mobility tasks. The XY Track layout is adapted to the multi-bed arrangement to support whole-room access within the shared...
Open the catalog to page 3From bedside transfer to corridor walking support In daily nursing practice, the CL100-3 supports a progression of mobility tasks. Following clinical assessment, selected patients may receive assisted walking training within connecting corridors. SUPPORTED TRANSFER BEDSIDE STANDING WALKING TRAINING Assistance for repositioning and patient transfers while coordinating beds, monitors, and medical lines. Support for a staged transition from bed to standing, subject to clinical assessment and the care plan. For selected patients, assisted walking training may be carried out in the room or connecting...
Open the catalog to page 4COORDINATED HANDLING Caregivers prepare and guide a supported mobility task in the patient room. PROGRESSIVE ACTIVITY Bedside sitting and standing can form part of a progressive pathway when clinically appropriate. The project supports standardized nursing transfer procedures, reduces reliance on high-risk manual lifting during appropriate tasks, and provides a flexible foundation for bedside sitting, standing, in-room walking, and corridor walking training assistance after assessment. MEDDO / CL100-3 / RENJI HOSPITAL ICU
Open the catalog to page 5KEY POINTS FOR EXTERNAL COMMUNICATION • XY Track coverage is used in both single-patient rooms and four-bed rooms to provide whole-room access. • Curved-track sections with different bend angles can be designed according to room geometry and care routes. • The CL100-3 supports routine nursing transfers and progressive mobility activities within the ICU. • Selected patients may receive assisted walking training in connecting corridors after clinical assessment. MEDDO / INTEGRATED MOBILITY SUPPORT FOR HEALTHCARE ENVIRONMENTS MEDDO / CL100-3 / RENJI HOSPITAL ICU
Open the catalog to page 63 Pages
2 Pages
2 Pages